Refurbish the home without disrupting the people who live there.
One Excel workbook to plan bedroom and communal area moves, keep residents safe and get every certificate signed off. Built by a construction project manager who delivers care sector projects.
Works in Excel and Google Sheets · Instant download · Launch price for the first 20 buyers
A care home isn't a normal building site.
Residents with dementia, frailty and complex needs are living metres from the work. Fire routes, infection control, nurse call and Legionella all have to keep working while rooms come out of use. Every move affects a resident, their family and their care plan. Generic construction templates don't cover any of that. This toolkit does, in one workbook you can hand to the registered manager, the contractor and your board.
The knowledge is built in.
This toolkit comes from over a decade of delivering refurbishment projects in occupied care homes across the UK. That means understanding the pressures on registered managers, the expectations of CQC, the way contractors need to work differently in a care setting, and the small decisions that protect residents when the dust sheets go up. Every tab, every check and every risk in this workbook reflects real projects — not a generic construction template adapted after the fact.
If you are planning a refurbishment and want to get it right from day one, this is the guide to use.
What's inside
Ten linked tabs. Yellow cells to fill in, everything else calculates itself.
Rolling room move planner
Set the batch size and timings. It schedules every batch and tracks each resident's move, family consultation and care plan update.
Communal areas planner
Plan where the lounge, dining room or bathroom moves to while it's closed, check the temporary space works, and get warned if two bathrooms close at once.
Pre-start compliance checklist
39 checks covering CDM 2015, asbestos survey, fire strategy and evacuation plans, infection control, Legionella, CQC registration and safeguarding.
Resident safety risk register
19 care-setting risks pre-loaded with controls. Ratings calculate automatically.
Phasing plan
Break the works into phases and see them on a 26-week timeline that draws itself from your dates.
Daily live-site check
18-point morning walkround for the contractor and the home together. Print it or tick it on a tablet.
Contractor induction log
Care-setting briefing, escort arrangements and card checks for every operative. Expired cards turn red.
Handover checklist
26 certificates and checks to collect before residents move in.
One-page dashboard
Progress, open risks, moves complete and outstanding documents, ready for your project meeting.
Refurbish four rooms. Move residents in. Do the next four.
Most homes can't empty a whole floor. The room move planner works the way real care projects run: a small batch at a time, with each resident moving once into a finished room.
- 1
Enter total rooms, rooms per batch and weeks per batch.
- 2
It checks you have enough empty rooms to start, then dates every batch.
- 3
Plan each resident's move: family consulted, care plan updated, room checked.
Who it's for
- Care home operators and groups planning refurbishment
- Estates and facilities managers
- Registered managers who need to stay in control of the works
- Contractors new to working in care settings
Built by someone who does this for a living
[YOUR NAME] is a construction project manager working mainly in the care sector. [ONE LINE ON YOUR EXPERIENCE.]
Connect on LinkedIn →Need something tailored to your project?
The toolkit covers the vast majority of care home refurbishment scenarios, but every project is different. If you need the workbook adapted for a specific project type, a larger programme of works, or want additional consultation on how to apply it to your situation, get in touch.
Get the Care Home Refurbishment Toolkit
One workbook, ten tabs, instant download. Works in Excel and Google Sheets.
Launch price for the first 20 buyers.
Buy and downloadSecure checkout with an emailed receipt. Need it for a whole care group? Ask about a team licence.